Measure position risk, drawdown, expectancy, costs and survival before scale. This guide is designed for Indian readers who want a clearer mental model before they use a calculator, place an order or compare an investment metric.

Define risk in rupees

A useful risk limit can be stated before the trade: how many rupees are you prepared to lose if the thesis is wrong or execution is worse than expected?

Connect quantity to invalidation

Entry, stop and lot size jointly determine the nominal loss. Changing any one changes the risk per position.

Measure after costs

Gross P&L can hide brokerage, taxes, spread and slippage. A process that looks positive before costs can become marginal after them.

Think in samples

A single trade can be lucky or unlucky. Expectancy, drawdown and streaks require a meaningful set of observations.

Common mistake

Confusing a high win rate with a low-risk process. One large loss can overwhelm many small winners.

Mini example

Mini example: if a trader allows ₹2,000 risk per trade, a 5-trade losing streak represents ₹10,000 before costs. The same streak is much easier to manage on a process that was sized for it than on a position built from maximum buying power.

A simple checklist

  • Write down the assumptions and units.
  • Verify current contract, charge or regulatory details where relevant.
  • Separate gross P&L from costs and execution effects.
  • Record what you knew before the outcome, not only what you know after it.
Learn the maths

Use the free tools before you trade.

Explore the 72-tool suite, then decide for yourself what the numbers mean for your process.

Explore 72 free tools

Frequently asked questions

What is the main idea?

Use the page to improve your understanding of the calculation, contract or process, then verify current market facts with primary sources.

Does this page give a trading recommendation?

No. The content is educational and does not provide a personalised buy, sell, target or stop-loss recommendation.

Can the examples predict returns?

No. Examples illustrate arithmetic or process; they are not forecasts of future market outcomes.

Primary-source learning: SEBI Investor · NSE India. For regulations, use the current official text rather than an old summary.